Power Requirements
Table 1 outlines the power service requirements for various locations:
Location Volts
Hertz
Amps
United States
125
60
20
Europe / Asia
220
50
15
Japan 125
60
20
Australia / Other: Setup as
needed per site
Table 1 Power Requirements
Power Installation
The following list outlines the power installation steps:
The customer’s electrician must run the proper voltage service with a
junction box and a standard outlet to within 2’ (0.5m) of the MCC
server installation location.
A Visara technical representative will contact the customer two weeks
before the scheduled MCC installation to verify that the MCC power
outlet has been successfully installed.
Note: Failure to install and test the MCC power outlet will delay
the MCC installation.