Site Installation

Site installation activities listed below are principally the responsibility of
the customer; Visara will assist where appropriate.

Power installation (Chapter 3 Power Requirements)

ƒ

Run the appropriate service to the MCC server installation location.

Cable installation.

Note: This is not a complete list, see Chapter 4 MCC Network and

Chapter 5 Connectivity Interfaces for more details.

ƒ

Run coax cable from each controller (3174 or other) port to the MCC
rack installation location.

ƒ

Enable the MCC’s IP address for remote client support on all HMCs.

ƒ

Run network cable from the appropriate systems (or a drop from the
corporate network) to the MCC server installation location for
telnet/VT100 access.

ƒ

Connect MCC to Network. Depends on network design decisions. Final
requirement is Ethernet access from each Thin Client / workstation to
the MCC server.

ƒ

Install analog phone line for the modem and phone.