What happens during MCC Installation?
Most of the installation process is preparation; actual setup time of the
MCC equipment is less than a day.
Many questions and issues may arise during this process. Please contact
your Visara sales rep or the Visara customer service directly for
assistance.
The physical preparation for the installation of the MCC consists of site
preparation, console preparation, network preparation, cable installation,
and power installation.
The MCC consists of both hardware and software. Physically, the
hardware is mounted in a rack and is installed in the data center. The
software runs on the MCC server and utilizes the hardware interfaces.
Software installation is described in the Software Installation Guide.
Large MCC installations may require multiple racks. Please verify the
physical configuration requirements with Visara customer services.
On installation day, the Visara technician will meet with the appropriate
customer personnel to discuss any remaining questions. Following this
meeting, the MCC will be unpacked and installed. If all pre-installation
requirements have been met, the initial installation should take less than
a day (time may vary due to extenuating circumstances).