beautypg.com

Power up the system, Power up the system -11 – Quintum Technologies Tenor DX User Manual

Page 46

background image

P/N 480-0049-00-10

3-11

Chapter 3: Installation

Power up the System

Once you have all cables connected properly, you are ready to turn the system on as follows:

1. Plug in the power cord to an AC outlet.

2. Locate the on/off switch on the back of the unit and click the switch to On.

The unit will power up and the LEDs will flash and turn off; the power LED will remain lit. For information
about the LEDs, see Chapter 2: Hardware Components.

Once the unit is powered up, you are ready to assign an IP address. See the following section Assign IP
Address
.