Install the ferrite inductive collars – Measurement Computing DaqBook 2000 Series User Manual
Page 62

Install the Ferrite Inductive Collars
1. Place one ferrite collar at each end of the Ethernet cable.
Snap the two collars shut. See photos.
2. Place the remaining ferrite collar next to the DIN5 connector
on the power cable. Snap the collar shut.
3.
Use a tie-wrap (one per ferrite collar) to secure each collar
to its respective cable.
This partial view of the host PC shows the
Ethernet cable with a ferrite collar. The
PC’s connection to the ground-line is also
visible.
Tie-wrap goes through
this opening.
4.
(Optional) Trim the excess tie-wrap material. While
trimming use care to avoid cutting into the cables.
This completes the installation.
This partial view of the data
acquisition device shows its
connection to the ground-line. It also
shows two ferrite collars, the foremost
of which is clamped to the power
cable. The background collar is
clamped onto the Ethernet cable.
1077-0901, rev 2.0
Ethernet CE Kit Instruction Sheet