Gas console connections – Hypertherm HT2000-200 Volt User Manual
Page 77
Part No.
Length
Part No.
Length
INSTALLATION
4-24
HySpeed HT2000
Instruction Manual
19
Nitrogen Plasma Supply Hose – Nitrogen Supply to Gas Console
Gas Console Connections
See page 4-10 for gas console connection to power supply.
Plasma Gas Supplies
Oxygen Plasma Supply Hose – Oxygen Supply to Gas Console
Note: If cutting with oxygen as the plasma gas, nitrogen must also be connected to the gas
console to achieve the proper oxygen/nitrogen mixtures in the preflow and cut flow
conditions.
Air Plasma Supply Hose
(Customer Supplied)
– Air Supply to Gas Console
Shield Gas Supplies
Any supply gases that will be used for the shield gas, attach to the same point on the gas console – see Fig.
4-14.
Shield Gas Supply Hose – Shield Supply to Gas Console
17
18
18
19
Part No.
Length
Part No.
Length
024204
15 ft (4.6 m)
024205
25 ft (7.6 m)
024155
50 ft (15 m)
024206
100 ft (30 m)
024159
150 ft (46 m)
Part No.
Length
Part No.
Length
024210
10 ft (3 m)
024203
15 ft (4.6 m)
024232
20 ft (6 m)
024134
25 ft (7.6 m)
024211
35 ft (10.6 m)
024112
50 ft (15 m)
024148
75 ft (23 m)
024116
100 ft (30 m)
024120
150 ft (46 m)
024185
180 ft (55 m)
024124
200 ft (61 m)
024043
4 ft (1.2 m)
024341
10 ft (3 m)
024342
20 ft (6 m)
024133
25 ft (7.6 m)
024012
50 ft (15 m)
024147
75 ft (23 m)
024115
100 ft (30 m)
024119
150 ft (46 m)
024184
180 ft (55 m)
024123
200 ft (61 m)