beautypg.com

Torch connections -10, Sequence of operation -4, Sequence of operation – Hypertherm HSD130 HySpeed Plasma User Manual

Page 150

background image

MAINTENANCE

5-4

HySpeed HSD130 RHF

Instruction Manual

Sequence of operation

1. Power-up – The system verifies that all of these signals are off at power-up

Coolant flow off
Chopper current off
Transfer off
Phase Loss off
Chopper 1 over-temp off
Magnetics over-temp off
Coolant over-temp off
Plasma start off

2. Purge – Air or O

2

gas flows through torch for 24 seconds

Coolant flow on
Contactor closes and the chopper performs a chopper test and a current sensor test
Plasma start off
Contactor opens when the purge cycle ends
Gas pressure OK

3. Idle

Gas pressure OK
Coolant flow on
Chopper current off
Line voltage OK

4. Preflow – Gas flows for 1.25 seconds

5. Pilot arc – Current flows between electrode and nozzle

Chopper, main contactor, and pilot arc relay are on
High frequency present
Chopper current sensor = pilot arc current

6. Transfer – Pilot arc current sensed on the worklead

7. Ramp-up – Chopper current increases to set-point and the gas switches to cutflow

Coolant flow on
Gas pressure OK
Phase loss on
Line voltage OK

8. Steady state – normal operating parameters

Coolant flow on
Gas pressure OK
Phase loss on
Chopper over-temp off
Magnetics over-temp off
Coolant over-temp off

9. Ramp-down – Current and gas flow decrease after plasma start has been removed

Cutflow gas off

10. Auto Off – 10-second postflow

Main contactor off
Chopper off