Harken 3813 System AA Battcar User Manual
Page 10
![background image](https://www.manualsdir.com/files/788631/content/doc010.png)
Installation – CB System (Slug Mount)
Install Track
10
System AA (CB)
7. Hold full-length track piece up to mast. Loosely install top screw.
Use putty knife to slide additional slugs and connector slug into place.
Loosely install all nineteen 4 mm x 20 mm screws.
8. Slide tracks up enough to fit next track.
Mast up: Hold upper tracks. Loosen screw that holds tracks. Slide track up.
Tighten new bottom screw securely.
9. Repeat until full-length tracks installed.
10. Raise tracks so 152 mm (6") bottom
track fits.
11. Install Screwpin Endstop Kit.
Note: If bottom full-length track blocks
feeder gap, load bottom track slugs
before installing track.
CAUTION! Do not let tracks drop.
Severe injury to hands and/or fingers can result.
This manual is related to the following products: