Guralp Systems CMG-6TD User Manual
Page 15

First encounters
The power and data distribution boxes are located at the front of the case.
The package is shipped with each instrument already connected to these
units, so you can begin testing immediately.
The power supply and combined USB data output cables can be accessed
through a waterproof port on the outside of the case.
To test the instruments:
1. Unscrew the port cover, and pull out the ends of the power and USB
cables.
2. Connect the power cable to your power source, attaching a suitable
connector, if necessary.
15
Issue F - February 2014