Gasboy Totalizer Retro User Manual
Page 9
MDE-4511B Retrofit Kits for Atlas™ Electro-mechanical and Commercial Electronic Units Installation Instructions · June 2011
Page 9
Installation
On both sides of the unit, place a N23140-01 decal (arrow), which is part of the kit, on the
bezel face to the left of the totalizer opening. Orient the arrow pointing to the left (away from
the totalizer opening). On Side A of the unit the arrow is pointing toward Side 1. On Side B of
the unit, the arrow is pointing toward Side 2.
Installing the DC Conduit (Commercial Unit Only)
Note: If you already have a DC conduit installed and the harness does not match the harness
provided with this kit, then remove the DC conduit and install the DC conduit supplied
with this kit.
To install the DC conduit, proceed as follows:
1
Remove the cover mounting screws and the cover at the junction box.
Note: Retain screws for remounting the cover.
2
Insert and tighten the Reducer (K49827) in the opening (location of the opening is shown in
).
Note: As a reminder, the conduit threads engage a minimum of five threads.
Figure 3: Junction Box Connections
Reducer (K49827)
Union (Q10016-04)
Shield (M05235B001)
Shield Mounting Screw
(M00417B224)
3
Insert the Conduit Union (Q10016-04) in the reducer installed in step
.
Note: When performing steps
through
on
,
ensure that
you hold the conduit in
place when mounting washers until it is connected to the union at the junction box.
4
Route the straight end of the conduit through the lower barrier plate. For conduit and washer
placement for steps
, see
on
5
Place a washer on the conduit (in the air gap).
6
Continue routing the conduit through the upper barrier plate.