Installation, Preparing for installation – Gasboy Totalizer Retro User Manual
Page 6

Installation
Page 6
MDE-4511B Retrofit Kits for Atlas™ Electro-mechanical and Commercial Electronic Units Installation Instructions · June 2011
Installation
Preparing for Installation
Before you begin, obtain permission from the manager/owner to remove power from the unit
and then remove power using normal procedures. Follow the OSHA lockout/tagout safety
procedures.
Ensure that you have the proper kit for the dispenser to be retrofitted.
1
Unlock and remove the doors from both sides of the unit using the proper key for the unit. Place
the doors in a safe place to prevent damage or scratches.
2
Remove the two screws securing the dial enclosure assembly and remove the assembly using a
cross-tip screwdriver.
Note: Retain the screws for replacing assembly after installation.
3
Remove the two screws (located above the display) at Side 1 of the unit and pull the display
cover forward using a cross-tip screwdriver. The cover will pivot down in a horizontal position
allowing access to the electronics section of the unit.
Note: Retain the screws for replacing the assembly after installation.
Installing the Pulse-out/RS-485 Board (Commercial Unit Only)
To install the Pulse-out/RS-485 Board, proceed as follows:
1
Locate the correct board for your application in the kit. The board type in your kit is determined
as follows:
• M06382K003 kit has the RS-485 Board (M06725A001) (New Bezel with Totalizer opening
may be required).
• M06382K004 kit has the Pulse-out Board (M06587A001).
Note: For description of kits, refer to
on
.
2
Connect the new board P2 Connector to P8 Connector of the Main Central Processing
on