beautypg.com

System installation – Comtech EF Data SNM-1001 User Manual

Page 23

background image

Installation

SNM-1001 Network Control Modem

2–2

Rev. 1

4. Save the packing material for reshipment purposes.

5. Inspect the equipment for damage incurred during shipment.

6. Check the equipment against the packing list to ensure that the shipment is

complete.

2.2 System

Installation

To install the modem:

1. Mount the modem chassis in the assigned position in the equipment rack. Refer

to
Figure 2-1 for a typical rack elevation for an M:N system. For a custom rack
installation, refer to the chassis dimensional drawing in Figure 2-2.

Connect the cables to the appropriate locations on the rear panel. Section 2.3
contains a description of connector pinouts, placements, and functions.

Before turning on the power switch, read and become familiar with Chapter 3.
Verify that all jumper settings are correctly set for remote operation. Jumper
settings are listed in Table 4-1.

Turn on the power switch, located on the rear panel.

Check for proper TX output signal level and spectrum.

Check for proper RX input signal level and spectrum.

If there is any problem with the installation, refer to Chapter 5 for instructions on
how to troubleshoot the system.