The BE1-11 is capable of transmitting the following items on an IEC 61850 network:
•
Configuration Settings
•
Metering
•
Status
•
Alarms
•
Targets
•
Breaker Operations
•
Direct Control
•
Fault Records
•
Load Profile
•
Oscillographic Records
•
Sequence of Events Reports
•
Unsolicited Reports
•
Peer to Peer Control GOOSE
•
Device Discovery
IEC 61850 Configuration
IEC 61850 Standard
The IEC 61850 standard defines the parts for communicating information between IEDs in a substation.
Figure 2 illustrates the Basler IEC 61850 configuration process.
Figure 2. Basler IEC 61850 Configuration Process
BESTCOMSPlus
®
BESTCOMSPlus software is provided with the BE1-11. Refer to the BESTCOMSPlus chapter for more
information.
BESTCOMSPlus performs the following tasks:
•
Maps BE1-11 inputs and outputs to IEC 61850 data points that can be read directly with an IEC
61850 browser
•
Uses a point-and-click method to configure BE1-11 settings and logic
•
Uploads and downloads BE1-11 settings files
•
Provides metering and reports from the BE1-11
Substation
Configuration Tool
SCD file
Basler
BEST61850
Validate SCL
and Map GOOSE
Basler
BE1-11 System
Basler
BESTCOMSPlus®
Create relay settings BSTX file
P
0
0
6
1
-4
4
Upload settings
Upload SCL
(CID file)
General Information
BE1-11