2 built-in battery, 1 replacement of battery, 2 charge and operation time of battery – Xtramus NuBAR-1000 V1.4 User Manual
Page 54: Built-in battery, Replacement of battery, Charge and operation time of battery
53
E-mail: [email protected]
Website: www.
X
tramus.com
XTRAMUS TECHNOLOGIES
®
4. Follow the instruction to finish the upgrade procedure.
5. Unplug and then plug power jack to restart this machine.
6. Repeat procedure and select FPGA Upgrade to upgrade FPGA
6.2 Built-in Battery
6.2.1 Replacement of Battery
There are two built-in NI-MH batteries for the operation of NuBAR-1000
Please pay attention to the notice below.
They are charged by USB cable via PC or external adapter in the NuBAR-1000 package.
They are advised to be replaced by authorized Xtramus technicians once operation time is
short obviously. Please contact with distributor for the replacement of battery. Remove the
warranty label and replace battery by yourself will lose warranty.
6.2.2 Charge and Operation Time of Battery
Fully charge is required for a chargeable fresh new battery that is pre-installed in the
NuBAR-1000. The charge and operation time is illustrated below
Battery charge time
Charge Device
Charge Time
Attached external
adapter
420 minutes if power is exhausted