10 Remove the front panel
A
B
A
2
1
Key
1 front panel retaining screw
2 front panel
• Undo the two screws (1) on the underside of the front panel
and remove the front panel (2).
11 Electrical connections
e
Incorrect installation can cause electric shock or
appliance damage. The electrical connection of the
appliance must be made only by a qualified engineer.
The appliance must be connected directly to an accessible, fixed,
switched, electrical outlet.
The external wiring must be earthed, with correct polarity and in
accordance with current standards.
The manufacturer declines any responsibility for damages to
persons or others caused by the incorrect installation of the
appliance earthing. This includes failure to comply with current
standards.
Electrical components have been tested to meet the equivalent
requirements of the BEAB.
• Do not use cable greater than 10 mm in diameter for the
electrical connections.
All system components must be of an approved type.
• Do not interrupt the mains supply with a time switch or
programmer.
The boiler is suitable for installation in bathroom zones 2 and 3.
11.1 Access to main board
i
It is necessary to remove the appliance front cover.
230
V
2
1
Key
1 User interface
2 fastening screw
• Pivot the user interface to access the electrical panel.
230
V
2
1
Key
1 230 V access cover
2 24 V access cover
• Tilt the user interface panel to access the 24V and 230V
connections.
INSTALLATION