Carrier 50PEC09-18 User Manual
Page 20

20
Fig. 19 — 50PEC Unit with Deluxe D and LON Controllers
Deluxe D
Deluxe D
AL
— Alarm Relay Contacts
BM
— Blower Motor
CAP
— Capacitor
CB
— Circuit Breaker
CO
— Sensor, Condensate Overflow
CR
— Compressor Relay
DM
— Damper Motor
ES
— End Switch
FP1
— Sensor, Water Coil Freeze Protection
FP2
— Sensor, Air Coil Freeze Protection
FSS
— Fan Speed Switch
HP
— High-Pressure Switch
HPS
— High-Pressure Switch
HPWS
— High-Pressure Water Switch
JW4
— Jumper Wire for Alarm
LOC
— Loss of Charge Pressure Switch
LON
— Local Operating Network
PB
— Power Terminal Block
RVS
— Reversing Valve Solenoid
TRANS
— Transformer
WV
— Water Valve
----------
Field Line Voltage Wiring
Field Low-Voltage Wiring
Printed Circuit Trace
LEGEND
Relay/Contactor Coil
Solenoid Coil
Thermistor
Circuit Breaker
Relay Contacts-N.O.
Switch-Temperature
Switch-High Pressure
Switch-Low Pressure
Ground
Wire Nut
Mate-N-Lock
>>
*Optional wiring.
NOTES:
1. Compressor and blower motor thermally pro-
tected internally.
2. All wiring to the unit must comply with local
codes.
3. Transformer is wired to 240-V (ORG) lead for
240-1-50 units. For 220-1-50 operation, switch
the RED and ORG leads at L1 and insulate the
RED lead. Transformer is energy limiting or may
have a circuit breaker.
4. FP1 thermistor provides freeze protection for
WATER. When using anti-freeze solutions, cut
JW3 jumper.
5. Low voltage wiring must be class 1 and voltage
rated equal or greater than unit supply voltage.
6. Factory cut jumper (JW4). Dry contact will be
available between AL1 and AL2.
7. Transformer secondary ground via GRN/YEL
wire from C to control box.
8. See view A for wiring of units with water valve
(part no. 23B00112N01) or view B for units with
water valve (part no. 23B00112N03).