beautypg.com

Carrier 50HQ User Manual

Single-package water-source heat pumps

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

Number One
AirConditioninq
Maker

^^2 Divisiort of

Carrier Corporation

-

i

Carrier Parkway • Syracuse NY 13221

Single-Package

Water-Source Heat Pumps

INDEX

Page

SAFETY CONSIDERATIONS...................................

1

INSTALLATION........................................................

1-5

Step 1 — Check Equipment and

Jobsite .......................................................................

1

• UNPACKAGE UNIT
• INSPECT EQUIPMENT
• COMPLETE OR CONSIDER THESE

SYSTEM REQUIREMENTS

Step 2 — Connect Supply Ductwork.....................

2

Step 3 — Make Piping Connections......................

3

• CONNECT WATER SUPPLY AND

RETURN LINES

• INSTALL BALANCING VALVES

Page

• MAKE CONDENSATE DRAIN

LINE CONNECTION

Step 4 — Make Electrical Connections...

4

• INSTALL A BRANCH CIRCUIT

DISCONNECT PER NEC

• BRING POWER LEADS INTO UNIT
• CONNECT GROUND LEAD TO

GROUND LUG IN SPLICE BOX

• SET FAN MOTOR SPEED
• CONNECT CONTROL POWER WIRING

START-UP..................................................................

6

SERVICE.................................................................... 7

SAFETY CONSIDERATIONS

Installation and servicing of air conditioning

equipment can be hazardous due to system pressure
and electrical components. Only trained and quali­
fied service personnel should install, repair or

service air conditioning equipment.

Untrained personnel can perform basic mainten­

ance functions of cleaning coils and cleaning and

replacing filters. All other operations should be

performed by trained service personnel. When

working on air conditioning equipment, observe
precautions in the literature, tags and labels
attached to the unit and other safety precautions
that may apply.

Follow all safety codes. Wear safety glasses and*,

work gloves. Use quenching cloth for brazing
operations. Have fire extinguishers available for all
brazing operations.

WARNING:

Before

performing

service

or

maintenance operaiions on system, turn off
main pow'er switch to indoor unit and outdoor

unit.

Electrical

shock

could

cause

personal

injury.

INSTALLATION

Step 1 — Check Equipment and Jobsite

UNPACKAGE UNIT — Move to final location.

INSPECT EQUIPMENT — File claim with ship­

ping company if shipment is damaged or incomplete.

COMPLETE OR CONSIDER THESE SYSTEM

REQUIREMENTS before installation:

a.

c.

d.

e.

Consult local building codes and National Elec­

trical Code (NEC) for special installation

requirements.

Consider type of water source. Ensure there is an
adequate supply of water at temperature of 60 F
to 90 F with minimum pressure of 20 psig.
Provide sufficient space for water piping, con­

densate drain, wiring and servicing unit. See

Fig. 1. (Units installed in confined areas may

have to be removed for major servicing such

as compressor or fan motor replacement.)

Provide a minimum 6-in. clearance between
return air filter and adjacent wall.

Mount unit on floor or solid platform. (The

50HQ units can be suspended from ceiling.

See “f’ below.) To reduce sound transmission,

especially when unit is located in a closet or

utility room having louvered doors, the follow­
ing acoustical treatment is recommended:

place an isolation pad under unit. Pad must be

same size as unit base. Construct a 1-in. fiberglass
sound shield in front of unit.

© Carrier Corporation 1981

Form 50HQ.VQ-2SI

This manual is related to the following products: