Carrier 50HQ User Manual
Single-package water-source heat pumps
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Number One
AirConditioninq
Maker
^^2 Divisiort of
Carrier Corporation
-
i
Carrier Parkway • Syracuse NY 13221
Single-Package
Water-Source Heat Pumps
INDEX
Page
SAFETY CONSIDERATIONS...................................
1
INSTALLATION........................................................
1-5
Step 1 — Check Equipment and
Jobsite .......................................................................
1
• UNPACKAGE UNIT
• INSPECT EQUIPMENT
• COMPLETE OR CONSIDER THESE
SYSTEM REQUIREMENTS
Step 2 — Connect Supply Ductwork.....................
2
Step 3 — Make Piping Connections......................
3
• CONNECT WATER SUPPLY AND
RETURN LINES
• INSTALL BALANCING VALVES
Page
• MAKE CONDENSATE DRAIN
LINE CONNECTION
Step 4 — Make Electrical Connections...
4
• INSTALL A BRANCH CIRCUIT
DISCONNECT PER NEC
• BRING POWER LEADS INTO UNIT
• CONNECT GROUND LEAD TO
GROUND LUG IN SPLICE BOX
• SET FAN MOTOR SPEED
• CONNECT CONTROL POWER WIRING
START-UP..................................................................
6
SERVICE.................................................................... 7
SAFETY CONSIDERATIONS
Installation and servicing of air conditioning
equipment can be hazardous due to system pressure
and electrical components. Only trained and quali
fied service personnel should install, repair or
service air conditioning equipment.
Untrained personnel can perform basic mainten
ance functions of cleaning coils and cleaning and
replacing filters. All other operations should be
performed by trained service personnel. When
working on air conditioning equipment, observe
precautions in the literature, tags and labels
attached to the unit and other safety precautions
that may apply.
Follow all safety codes. Wear safety glasses and*,
work gloves. Use quenching cloth for brazing
operations. Have fire extinguishers available for all
brazing operations.
WARNING:
Before
performing
service
or
maintenance operaiions on system, turn off
main pow'er switch to indoor unit and outdoor
unit.
Electrical
shock
could
cause
personal
injury.
INSTALLATION
Step 1 — Check Equipment and Jobsite
UNPACKAGE UNIT — Move to final location.
INSPECT EQUIPMENT — File claim with ship
ping company if shipment is damaged or incomplete.
COMPLETE OR CONSIDER THESE SYSTEM
REQUIREMENTS before installation:
a.
c.
d.
e.
Consult local building codes and National Elec
trical Code (NEC) for special installation
requirements.
Consider type of water source. Ensure there is an
adequate supply of water at temperature of 60 F
to 90 F with minimum pressure of 20 psig.
Provide sufficient space for water piping, con
densate drain, wiring and servicing unit. See
Fig. 1. (Units installed in confined areas may
have to be removed for major servicing such
as compressor or fan motor replacement.)
Provide a minimum 6-in. clearance between
return air filter and adjacent wall.
Mount unit on floor or solid platform. (The
50HQ units can be suspended from ceiling.
See “f’ below.) To reduce sound transmission,
especially when unit is located in a closet or
utility room having louvered doors, the follow
ing acoustical treatment is recommended:
place an isolation pad under unit. Pad must be
same size as unit base. Construct a 1-in. fiberglass
sound shield in front of unit.
© Carrier Corporation 1981
Form 50HQ.VQ-2SI