beautypg.com

Warning – Reznor P6SP Unit Installation Manual User Manual

Page 4

background image

4

Figure 1. Minimum clearances to

combustibles

Top of unit

to be

unobstr

ucted

Recommended Clearances

for Servicibility

Minimum Required

Clearances to Combustibles

36"

36"

36"

36"

48"

60"

48"

unIt InstallatIon

Minimum clearance requirements

Units are certified as combination Heating and Cooling

equipment for outdoor installation only at the minimum

clearances to combustible materials shown. Clearances

shown in Figure 1 are for both Downflow and Horizontal

discharge.

Packaging removal

1. Remove top crate brackets and wooden cap assembly

from top of unit (Figure 3, page 5).

2. Remove lower crate brackets, 4 side skids, and 2 end

skids from each side of unit.

Do not remove base

rails from unit.

3. Rig unit and raise up approximately 4 feet off the ground.

(Also see Rigging and Hoisting section).

4. Remove crate brackets (Figure 4, page 5) securing

long and short bottom boards to underside of unit.

notE: some screws are located in fork slots.

5. Remove long & short bottom boards from beneath unit.
6. Inspect unit thoroughly for shipping damage.
7. Carefully lower and position unit to it’s permanent

location.

rigging & Hoisting

WarnInG:

to avoid the risk of property damage, personal
injury, or death, it is the rigger’s responsibility
to ensure that whatever means are used to hoist
the unit are safe and adequate:

the lifting equipment must be adequate for the

load. see table 1 (page 18) for unit weights.

the unit must be lifted from the holes in the

base rails using cables or chains as shown in

Figure 5 (page 4).

spreader bars (Figure 5) are required to protect

the unit and ensure even loading.

Keep the unit in an upright position at all times.

the rigging must be located outside the units

center of gravity. refer to Physical Data info

(pages 13 - 18) for center of gravity locations.

all panels must be securely in place during

rigging and hoisting.

Roof Curb

Condensate

Drain

3"

Min.

Figure 2. condensate Drain

The electric unit is suitable for installation on combustible

flooring or class A, B, or C roofing materials. A clearance

of at least 36 inches to combustibles from all sides of the

unit is required.

Where accessibility to combustibles

clearances are greater than minimum unit clearances,

accessibility clearances must take preference.

Sufficient clearance for unobstructed airflow through the

outdoor coil must be maintained in order to achieve rated

performance.

thermostat

A 2 stage cooling 24VAC thermostat is required for these

units.

notE: If “optional” electric heat is added, a 1 Stage

Heat / 2 Stage Cool 24VAC electric heating/electric cooling

thermostat must be used.

air Filter requirements

A suitable air filter must be installed in the unit or in the

return air system. Refer to Specification & Electrical Data

Table for recommended filter sizes. Air filter pressure drop

must not exceed 0.08 inches WC.

This unit is supplied with air filters. Air filter(s) must be

installed ahead of the evaporator coil of this unit. All

return air to this unit must pass through the filters before

entering this unit.

WarnInG:

never operate unit without a filter. a failure to
follow this warning could result in a fire, personal
injury, or death.

condensate Drain

Condensate is removed from the unit through the 3/4”

(19mm) PVC pipe located on the front side of the unit. Install

a 3” (8 cm) Min. trap between the drain line and an open

vent of the same size for proper condensate removal. (See

Figure 2) Refer to local codes and restrictions for proper

condensate disposal requirements. When connecting

rigid drain line, hold any fittings with a wrench to prevent

twisting.

Do not overtighten!