6 completing the installation, Completing the installation -14 – Cabletron Systems 6E133-25 User Manual
Page 40
Chapter 3: Installation
3-14
6E122-26, 6E132-25, 6E123-26 and 6E133-25 User’s Guide
c.
Verify that the fiber connection meets the dB loss specifications
outlined in
If a link has not been established, contact the Cabletron Systems Global
Call Center. Refer to
,
3.6
COMPLETING THE INSTALLATION
The 6E12X-26 and 6E13X-25 are now ready to be set up through Local
Management. Refer to
modules and 6C105 chassis.