AERCO KC1000 Boiler equipped with Mod-Box Controller User Manual
Kc series gas fired boiler system, Installation, operation & maintenance instructions, Gf-106

Printed in U.S.A.
REVISED 01/03/05
Instruction
No.
AERCO INTERNATIONAL, Inc., Northvale, New Jersey, 07647 USA
Installation, Operation
& Maintenance Instructions
KC Series
Gas Fired
Boiler System
Semi
-Instantaneous, Condensing,
Forced Draft,
Natural Gas and Propane Fired,
Hot Water Boiler
1,000,000 BTU/HR Input
Applicable to Serial Numbers G-01-026 and above
Patent No. 4,852,524
GF-106
Table of contents
Document Outline
- Telephone Support.pdf
- Section 2.pdf
- Boiler Clearances
- Lifting Lug Location
- Supply and Return Location
- Relief and Drain Valve Location
- Pressure /Temperature Gauge Installation
- Pressure/Temperature Gauge Installation
- Condensate Drain System Location
- Gas Supply Regulator and Manual Shut -Off Valve Location
- AC Wiring Box Location
- Electrical Wiring Diagram
- Field Control Wiring Box Location
- Field Control Box Wiring
- Section 3.pdf
- Section 4.pdf
- Section 5.pdf
- Section 6.pdf
- Section 7.pdf
- Section 8.pdf