B&C Technologies SA Series Industrial User Manual
Page 20
INSTALLATION PROCEDURES
3-8
Never touch internal or external steam pipes, connections, or components.
These surfaces can be extremely hot and will cause severe burns. The steam
must be turned off and the pipe, connections, and components allowed to cool
before the pope can be touched
For machines equipped with optional steam heat, install piping in accordance with approved
commercial steam practices. Steam requirements are shown in the table below. Failure to install the
supplied steam filter may void the warranty.
Table.3-6 Table for steam size
Wear Eye and hand protection when handling chemicals. Always avoid direct
contact with raw chemicals. Read the manufacturer’s directions for accidental
contact before handling chemicals. Ensure that an eye – rinse facility and an
emergency shower are within easy reach. Check at regular intervals for
chemical leaks.
The following procedures must be observed when connecting any chemical injector to the
washer – extractor. See the figure for a typical supply injection system setup. Undiluted chemicals
dripping can damage the machine. Therefore, all chemicals supply dispenser pumps should be
mounted below the washer’s injection point. All dispensers tubing should also run below the
injection point. Loops do not prevent drips if these instructions are not followed. Failure to follow
these instructions could damage the machine and void the warrant.
The supply compartment on the SA models is located on the front of the machine. Supply
cups can be accessed by opening the dispenser lid. The supply cups can be removed and filled as
desired. Supply compartments are numbered 1, 2, 3 and 4 from the left of the machine to the right
External supply connections for the SA washer – extractors are located on rear of the machine.
Hose connections should be made via the threaded connectors. See figure.
1.
Remove plug from base. See figure. Plugs are assembled inside the tubing ring.
2.
Install strain relief, included in the seal nut.
3.
Insert tubes through base, do not remove cups. Tube should extend into the plastic cup, with
the exception of the softener be routed to the outside of the cup.
4.
Tighten the seal nut to prevent tubing from escaping the assembly.
MODEL
Units
STEAM INLET and CONSUMPTION:
Metric
US
SA 475
Steam inlet size
DN
in
1 1/4
1 1/4
Required steam to heat bath 10 ºF (5.55 ºC) LOW
kg
lbs
- -
Required steam to heat bath 10 ºF (5.55 ºC) HIGH
kg
lbs
- -
Average Steam consumption per cycle
kg
lbs
- -
G. STEAM CONNECTION
H. EXTERNAL CHEMICAL SUPPLIES