Series 8750XD Unitized Curtain Wall Installation Instructions
1. Before installing the units, follow this checklist to ensure they are ready for installation:
a. Inspect the units to ensure that each unit has all external gaskets and screws. The WA02 and WC21 gaskets will be shop crimped in place.
Verify these gaskets have been crimped securely to the frame. Always check for proper crimping and for missing gaskets.
b. Using an approved solvent or cleaner, clean the vertical and horizontal stack gaskets of all oils and other contaminants ( LC23, LC54,
WC21 and WA02).
c. Mullion plugs are required at the head. Also plugs are required at the head end of the captured system at the end of the Duracast verticals. The
mullion plugs are shop applied and sealed in place. Check to ensure the mullion plugs have been properly applied.
d. All front screw spline screws head should be sealed. See figure 49.
Section 6 - Unit Inspection and Preparation for Installation
Figure 48
Figure 47
Figure 49
LC23
spacer
FM41
Hanger
FM11
Mullion
Anchor
FM40 Split Mullion
Attachment Clip
WA02
WNC1 With Sealant
to cover cavity
LC54 sweep
cut 1/8”
short per
side to allow
weeping
H12C Mull
Plug
WC21
Front screw spline
screw heads sealed.
FM41
Hanger