1. Before installing the units, follow this checklist to ensure they are ready for installation:

a. Inspect the units to ensure that each unit has all external gaskets and screws. The WA02 and WC21 gaskets will be shop crimped in place.

Verify these gaskets have been crimped securely to the frame. Always check for proper crimping and for missing gaskets.

b. Using an approved solvent or cleaner, clean the vertical and horizontal stack gaskets of all oils and other contaminants ( LC23, LC54,

WC21 and WA02).

c. Mullion plugs are required at the head. Also plugs are required at the head end of the captured system at the end of the Duracast verticals. The

mullion plugs are shop applied and sealed in place. Check to ensure the mullion plugs have been properly applied.

d. All front screw spline screws head should be sealed. See figure 49.

Section 6 - Unit Inspection and Preparation for Installation

Figure 48

Figure 47

Figure 49

LC23

spacer

FM41

Hanger

FM11

Mullion
Anchor

FM40 Split Mullion

Attachment Clip

WA02

WNC1 With Sealant

to cover cavity

LC54 sweep

cut 1/8”

short per

side to allow

weeping

H12C Mull

Plug

WC21

Front screw spline

screw heads sealed.

FM41