beautypg.com

Mullion installa on into subframe – EFCO Special Purpose Windows Installation User Manual

Page 51

background image

 

EFCO 2014 

 

12 

Window Installation Instructions - Typical Subframe Installation Section

Mullion Installa on Into Subframe 

 A ach the 4” pressure clip at the sill end.  It 

should contact the subsill.   

 Seal this pressure clip to the subsill and both 

window jambs.   

 Seal over the head of all fasteners that pierce 

the 4” clip.   



Note: The sealing of this 4” pressure clip
is criƟcal and should be done just prior
to installing the verƟcal cover.

 Field cut and/or notch the ver cal cover and 

snap over the mullion clips. 

 Fillet seal the exterior of the mullion to the    

window jambs. 



Seal the head end of the mullion to the 
subhead. 



Seal the sill end of the mullion to the 
subsill. 



Join all exterior sealant lines. 



Tool sealant and inspect for pinholes. 

 

Notch at subhead may be   
required (see shop drawings) 

Notch at subsill may be 
required (see shop 
drawings) 

Take care to not 
damage finish or 
dent cover when 
snapping on. 

Seal 4” clip to subsill, 
tool sealant into all 
crevices and hollows  

pay special a en on 
to this hole 

Seal 4” 
clip to both 
window jambs 

Join sealant lines 

Cover all fastener 
head  with      
silicone sealant 
and tool 

Join sealant lines 

Seal sill end to 
subsill (sim. at 
head end) 

Seal mullion 
to both   
window 
jambs 

12