EFCO Special Purpose Windows Installation User Manual
Page 31

EFCO CORPORATION 7/10/2014 PART NO. YW40
Page 2 of 3
Window Installation Instructions - Casement Window Installation Section -
Typical Hinge Anchorage at Fixed to Vent Stack Joint
Typical Hinge Anchorage at Vent to Vent Stack Joint
Typical Hinge Anchorage at Subjambs
Completely read the General Installation Instructions and all other sections which pertain
to your project before starting work. These recommendations are for general erection
procedures only. For actual job conditions, see the details on the shop drawings. For
perimeter anchor types and spacing, refer to the approved shop drawings or consult the
project design professional.
Through bolt supplied by EFCO. Drilling of frames and support
materials or notching of glazing hooks Not by EFCO.
Perimeter fasteners are Not by EFCO. Drilling of frames and
support materials or notching of glazing hooks Not by EFCO.
EFCO Corporation will not
be held liable or accept
responsibility for damage to
the glazing beads, window
finish, or broken glass which
is a result of this type of
installation.
Through bolt supplied by EFCO. Drilling of frames and
support materials or notching of glazing hooks Not by EFCO.
A casement
window must be
installed plumb
and secure. All
hinges must be
securely blocked
and anchored to
the window
opening or
mullions through
the hinge leaves or
as close as
possible to the
hinges.