beautypg.com

Subsill to subjamb cri cal seal areas – EFCO Special Purpose Windows Installation User Manual

Page 43

background image

 

EFCO 2014 

 

Window Installation Instructions - Typical Subframe Installation Section

Subsill to Subjamb Cri cal Seal Areas 

 Seal subframe to building cond on around the en re 

perimeter of the opening, using a silicone compa ble 
sealant as specified by the architect or contractor. 

 Tool sealant into subsill profile. 

 Tool sealant into void around subsill extender. 

 Silicone sealant to be con nuous from subjamb to     

subsill, silicone should have a minimum contact of 1/2” 
with each surface. Tool  into all crevices and corners. 

 Seal subjamb leg to subsill and tool well. 

 Run a bead at least 6” up the thermal pocket of the   

subjamb, join this sealant line to the subsill sealant. 

Con nuous bead to seal 
subjamb to jamb condi on 

Tool sealant into 
subsill profile 

Pay special a en on 
to this area 

Pay special a en on 
to this area 

Subjamb to subsill seal 

Seal 6” up thermal area 

Seal leg to subsill 

Shim as required 
(by others) 

Backer rod 
(by others)