Subframe installation, Subsill prepara on prior to installa on – EFCO Special Purpose Windows Installation User Manual

Page 40

background image

 

EFCO 2014 

 

Window Installation Instructions - Typical Subframe Installation Section

Sealant  over strut area  

1/4” diameter weep holes 

Subsill extension 

Preferred method of sealing 
extension to subsill (visible seal) 

Alternate method of sealing 
extension to subsill (blind seal) 

STC6 End dam a achment 
screws (by EFCO) 

Subsill Prepara on Prior to Installa on 

 Measure the opening for the horizontal opening dimension.   

 Square cut the subsill the length of the M.O. (masonry       

opening) minus 1/2”.   

 Sealant  over strut area is by EFCO if subsill is ordered         

fabricated.  If subsill is ordered in stock lengths this sealant is 
by installer. 

 If the subsill has an extension:  



The extension must be cut to the same length as the 
subsill. 



Check the opening condi on and shop drawings to verify 
that no special notches in the extender are required. 



Slide the extension into the subsill as shown and flush up 
the ends. 



Seal the extension to the subsill using one of the two 
methods shown in the figures to the le . 



While the sealant is s ll wet, care must be taken to the 
orienta on and handling of the extension in rela on to 
the subsill.  The extension should be supported in the 
desired finished posi on while the silicone is curing. 

 Field drill 1/4” diameter weep holes 6” from each and not to 

exceed 5’ on center (by installer). 

 Profile seal the end of the subsill and a ached the end dam 

gasket and the end dam with the provided STC6 screws.  Tool 
excess sealant squeeze out. 

 It is the installers responsibility to properly clean and seal end 

dams to ensure a water ght installa on.  Subsills should be 
tested periodically during the installa on by blocking off the 
weep holes, filling the subsill with water and inspec ng for 
joint leaks.  EFCO will not be responsible for leaks due to     
improperly sealed or missing end dams. 

 

End dam gasket 

Profile seal end of subsill 
(required) 

End dam