Edge Lighting Cirrus Float for Monorail User Manual
Installation instructions for, Important information, Save these instructions
Installation Instructions for
Cirrus Float D1 For Fast Jack, Monorail,
and Monorail Two Circuit
Install the Fast Jack Connector to Coaxial Power Cable
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
© 2013 Edge Lighting. All Rights Reserved.
SAVE THESE INSTRUCTIONS!
- This product is suitable for indoor dry locations.
- This instruction shows typical installation for Fast Jack
canopies, Monorail, and Monorail Two Circuit.
- For installation on T-Bar Clip use the Cirrus T-Bar clip
instructions (904-CS-TBAR) concurrently with these
instructions.
IMPORTANT INFORMATION
904-FJ-CF-D1-01
1
FJ-CF-D1-_
M-CF-D1-_
1: Loosen the M4 set screw on base of the coaxial fixture
connector with the 2mm Allen wrench provided. Do not
remove this set screw.
2: Remove the M3 set screw on tip of the connector with the
1.5mm Allen wrench provided.
B
COAXIAL CABLE
INSULATION
WIRE STRIPPER
1"
3
3: Use the #12 gauge hole of the AWG wire strippers to strip
1" of the insulation cover from the end so that the bare
coaxial cable is exposed.
C
CONICAL NIPPLE
STRAIN RELIEF TUBE
OUTER METAL JACKET
4
5
INSULATION
4: Feed the coaxial cable through the conical nipple and flared
side of the strain relief tube. Slide the conical nipple down
the coaxial cable. Slide the strain relief tube against the
insulation.
5: Use the #14 gauge hole of the AWG wire strippers to strip
the outer metal jacket exposed behind the strain relief tube.
A
1.5MM ALLEN
WRENCH
2MM ALLEN
WRENCH
M4 SET SCREW
M3 SET
SCREW
1
2
COAXIAL FIXTURE CONNECTOR
M2-CF-D1-_