beautypg.com

Field set-up checklist, Field operation, Field set-up checklist field operation – Great Plains PFC2000 Operator Manual User Manual

Page 32

background image

30

407-158M

03/28/2007

Field Set-Up Checklist

Use the following tables to develop a final checklist for
your tractor/cart configuration. Additional or fewer steps
may be necessary depending on tractor features, cart
options and planting accessories.

Field Operation

Because tank cart operation is largely automatic, few
steps need to added to planter operations. Tank opera-
tions during planter motion are covered in the YP2425
Operator’s Manual.

Table 1: Mechanical

Page

Pintle hitch closed on tongue loop

13

Chain secured to planter hitch

13

Tank hoops and straps tight. Tanks
secure.

-

Parking chocks removed from wheels

-

Walkboard ladder stowed

18

Table 2: Electrical

Page

Verify electrical hookups solid

14

Power up seed monitor and observe
any diagnostic messages

*

*. Refer to monitor manual.

Running/braking/turning lamps all work-
ing

-

Table 3: Plumbing

Page

Hose circuits to be used, secured to
correct planter inlets

16

Unused hoses secured on tongue and
protected from dust/debris

16

Closed: Quick-fill shut-off valve

21, 22

Open: Outlet/discharge valve on tank to
be used

-

PFC2000: pump selector valve set to
tank to be used

23

Open: valve(s) on hose lines to planter

23

Open: valve(s) on planter inlet(s)

23

Fertilizer rate setting computed and set
on pump

23

Check for leaks at all fittings and con-
nections, and under tanks generally

-

Table 4: Fertilizer

Page

Check for correct orifice plates

*

*. Check Seed Rate manual.

Check unused rows correctly closed off

-

Check all row unit lines are connected,
free of kinks, and discharge tube/noz-
zles are clear

-

Gauge Wheel Cart Drive

Page

Check gauge wheel inflation and tread
condition

46

Check all chains for lubrication and
proper slack

43

Check clutch operation

31

This manual is related to the following products: