Field set-up checklist, Field operation, Field set-up checklist field operation – Great Plains PFC2000 Operator Manual User Manual
Page 32

30
407-158M
03/28/2007
Field Set-Up Checklist
Use the following tables to develop a final checklist for
your tractor/cart configuration. Additional or fewer steps
may be necessary depending on tractor features, cart
options and planting accessories.
Field Operation
Because tank cart operation is largely automatic, few
steps need to added to planter operations. Tank opera-
tions during planter motion are covered in the YP2425
Operator’s Manual.
Table 1: Mechanical
Page
Pintle hitch closed on tongue loop
Chain secured to planter hitch
Tank hoops and straps tight. Tanks
secure.
-
Parking chocks removed from wheels
-
Walkboard ladder stowed
Table 2: Electrical
Page
Verify electrical hookups solid
Power up seed monitor and observe
any diagnostic messages
*
*. Refer to monitor manual.
Running/braking/turning lamps all work-
ing
-
Table 3: Plumbing
Page
Hose circuits to be used, secured to
correct planter inlets
Unused hoses secured on tongue and
protected from dust/debris
Closed: Quick-fill shut-off valve
Open: Outlet/discharge valve on tank to
be used
-
PFC2000: pump selector valve set to
tank to be used
Open: valve(s) on hose lines to planter
Open: valve(s) on planter inlet(s)
Fertilizer rate setting computed and set
on pump
Check for leaks at all fittings and con-
nections, and under tanks generally
-
Table 4: Fertilizer
Page
Check for correct orifice plates
*
*. Check Seed Rate manual.
Check unused rows correctly closed off
-
Check all row unit lines are connected,
free of kinks, and discharge tube/noz-
zles are clear
-
Gauge Wheel Cart Drive
Page
Check gauge wheel inflation and tread
condition
Check all chains for lubrication and
proper slack
Check clutch operation