Make fertilizer connections, Cart connection overview, Planter connection overview – Great Plains PFC2000 Operator Manual User Manual
Page 17: Caution

Preparation and Setup 15
03/28/2007
407-158M
Make Fertilizer Connections
!
CAUTION
Always wear chemical gloves and other protective apparel
and equipment specified for the materials to be applied.
Material hose connections depend on your planter
configuration, cart model, and intended application.
Refer to Figure 5 and to Figure 23 and Figure 24 on pages
48 and 49.
Cart Connection Overview
1.
Manifold port 1, 2in CAM
This hose supplies the “Hi-Rate” manifold section
on the left side of the planter.
2.
Manifold port 2, 2in CAM
This hose supplies the “Hi-Rate” manifold section
in the center section of the planter.
3.
Manifold port 3, 2in CAM
This hose supplies the “Hi-Rate” manifold section
on the right side of the planter.
4.
Manifold port 4, no hose
By-pass to 1600 gallon tank. Opened by seed
monitor whenever any of ports 1, 2 or 3 are closed.
5.
Gauge line,
3
⁄
4
in CAM
Supplies pressure gauge on planter
6.
400 Gallon Tank line, 2in CAM
Present only on model PFC2000, supplies single
line to ground drive pumps of “Starter” system on
planter.
Planter Connection Overview
L.
Left Side, 2in CAM receptacle
Hi-rate inlet for planter left wing.
C. Center, 2in CAM receptacle
Hi-rate inlet for planter center section.
R. Right Side, 2in CAM receptacle
Hi-rate inlet for planter right wing.
S. Starter, 2in CAM receptacle
Inlet for entire starter fertilizer manifold. Present as
only if starter manifold installed; otherwise
gauge line inlet
is mounted at this position.
G. Gauge Line,
3
⁄
4
in CAM receptacle
Gauge (only) line for tank cart pump. Supplied with
tank cart. May be factory-installed. Tied to other
hoses if no bracket position available.
Figure 5
PFC2000 Hose Connections
26145
Planter has both Starter & Hi-rate Systems
Planter has only Hi-rate System
L
C
R
S
G
L
C
R
G
Figure 6
YP2425 Fertilizer Inlets
26146
S
G