Operating instructions, Pre-start checklist, Tank inspection – Great Plains PFC2000 Operator Manual User Manual
Page 20: Pre-start checklist tank inspection

18
407-158M
03/28/2007
Operating Instructions
This section covers general operating procedures.
Experience, machine familiarity, and the following
information will lead to efficient operation and good
working habits. Always operate farm machinery with
safety in mind.
Pre-Start Checklist
Perform the following steps before transporting the
PFC1600/2000 Cart to the field.
❑
Carefully read “Important Safety Information” on
page 1.
❑
Review the application instructions and Material
Safety Data Sheet (MSDS) for the fertilizer(s).
❑
Review the plumbing location/control diagram for
your tank cart.
❑
Lubricate cart as indicated under “Lubrication” on
page 43.
❑
Check all tires for proper inflation. See “Tire Infla-
tion Chart” on page 46.
❑
Check all bolts, pins, and fasteners. Torque as
shown in “Torque Values Chart” on page 47.
❑
Check cart for worn or damaged parts. Repair or
replace parts before going to the field.
❑
Check tank hoops and straps to be sure they are
tight and tanks are secure.
❑
Check fertilizer hoses, fittings, and valves for
leaks. Repair or replace before going to the field.
❑
Always inspect the tanks before use.
Tank Inspection
1.
Wear a respirator suitable for the material pres-
ently in or previously dispensed from the tank(s).
2.
Swing the ladder down from its storage position on
the walkboard.
3.
Remove the lid on each tank and inspect for:
- residual fertilizer incompatible with next use
- contaminants
- debris that might clog filters
- trapped animals lost tools, etc.
If it is necessary to flush a tank, or remove debris
too large to flush, see “Tank Cleaning” on
page 42.
4.
Re-secure each lid and stow the ladder.
MSDS
Figure 9
Inspection Access Ladder
26150