Field pumping – Great Plains PFC2000 Operator Manual User Manual
Page 25

Operating Instructions 23
03/28/2007
407-158M
Field Pumping
Regardless of the tank(s) and manifolds to be used,
perform the following:
1.
Make all pre-use maintenance and safety checks.
2.
Determine and make the cart pump dial setting (if
cart pump to be used). See “Pump Setting Deter-
mination” on page 37.
3.
Hitch the cart to the planter; make and check all
electrical and plumbing connections.
Refer to Figure 23 on page 48 or Figure 24 on page 49.
4.
Load fertilizer in the tank(s) to be used; shut off
and cap the quick-fill inlet
. PFC2000 only: Set
quick-fill selector valve
5.
Configure the seed monitor to apply fertilizer, but
have the “Fert.Pump” switch OFF for the moment.
6.
Open the (four or five) hose valves on both sides
(planter/cart) of the connections at the planter rear
hitch.
25421
26033