Tweco 300 XT Ultra-Cut Plasma Cutting System User Manual
Operating manual, Ultra-cut 300 xt, Plasma cutting system
Table of contents
Document Outline
- SECTION 1:GENERAL INFORMATION
- 1.01 Notes, Cautions and Warnings
- 1.02 Important Safety Precautions
- 1.03 Publications
- 1.04 Note, Attention et Avertissement
- 1.05 Precautions De Securite Importantes
- 1.06 Documents De Reference
- 1.07 Declaration of Conformity
- 1.08 Statement of Warranty
- SECTION 2: SPECIFICATIONS
- 2.01 General Description Of The System
- 2.02 Plasma Power Supply
- 2.03 Remote Arc Starter
- 2.04 Gas Control Module
- 2.05 Precision Plasma Cutting Torch
- 2.06 Specifications & Electrical Requirements
- 2.07 Power Supply Dimensions
- 2.08 Power Supply Rear Panel Features
- 2.09 Gas Requirements
- 2.10 Gas Applications
- 2.11 XT Torch Specifications
- SECTION 3: INSTALLATION
- 3.01 Installation Requirements
- 3.02 System Layout
- 3.03 Recommended Gas Supply Hose
- 3.04 Leads and Cables All Amperage
- 3.05 Lift the Power Supply
- 3.06 Connect Input Power and Ground Cables
- 3.07 Connect Work Cable and Pilot and Negative Leads
- 3.08 Ground Connections
- 3.09 Connect Coolant Leads
- 3.10 Connect Cables for CNC, Remote Arc Starter, GCM and HE 400
- 3.11 Handling and Installation of Fiber Optics
- 3.12 Set Switches on the Command - Control Module
- 3.13 Height Control Connections
- 3.14 Gas Control Module Installation
- 3.15 Fiber Optic Cable Installation
- 3.16 Gas Control Module: Control, Input, and Output Connections
- 3.17 Optional HE400 COOLER
- 3.18 Install Remote Arc Starter
- 3.19 Torch Valve Installation
- 3.20 Connecting Torch
- 3.21 Install Consumable Torch Parts
- 3.22 Voltage Divider for iHC Torch Height Control
- 3.23 Complete the Installation
- SECTION 4: OPERATION
- 4.01 Power Supply Control Panel
- 4.02 System Operation
- 4.03 Gas Selection
- 4.04 GCM 2010 Gas Control Module Operation
- 4.05 GCM 2010 First Time Operation Matching Gas Control to Lead Length
- 4.06 GCM 2010 Sequence Of Operation
- 4.07 Power Supply Status Codes
- 4.08 Remote Arc Starter Trouble Shooting
- SECTION 5: MAINTENANCE
- 5.01 General Maintenance
- 5.02 External Coolant Filter Cleaning Procedure
- 5.03 Coolant Replacement Procedure
- SECTION 6: REPLACEMENT ASSEMBLIES & PARTS
- 6.01 Replacement Power Supply
- 6.02 System Layout
- 6.03 Recommended Gas Supply Hose
- 6.04 Leads And Cables All Amperages
- 6.05 Power Supply External Replacement Parts
- 6.06 Power Supply Replacement Parts - Upper Right Side
- 6.07 Power Supply Replacement Parts - Lower Right Side
- 6.08 Power Supply Replacement Parts - Rear Panel
- 6.09 Power Supply Replacement Parts - Left Side
- 6.10 Gas Control Module (GCM-2010) Replacement Parts
- 6.11 Gas Control Module (GCM-2010) Replacement Parts
- 6.12 Remote Arc Starter (RAS-1000 XT) Replacement Parts
- 6.13 HE 400 Heat Exchanger - Replacement Parts
- SECTION 7: TORCH MAINTENANCE
- 7.01 Consumable Removal
- 7.02 O-Ring Lubrication
- 7.03 Parts Wear
- 7.04 Torch Consumables Installation
- 7.05 Coolant Leak Trouble-Shooting
- APPENDIX 1: Remote Arc Starter Schematic
- APPENDIX 2: Gas Control and Torch Valve Schematic
- APPENDIX 3: Gas Control Module Plumbing Diagram
- APPENDIX 4: Gas Control Module PCB Layout
- APPENDIX 5: Gas Control Display Module PCB Layout
- APPENDIX 6: CNC - Control Module PCB Connections
- APPENDIX 7: CNC
- CNC functions
- CNC Input / Output Descriptions
- Simplified CNC Circuit
- CNC Connections
- Appendix 8: CCM CPU PCB Layout
- Appendix 9: CCM I/O PCB Layout
- Appendix 10: Pilot PCB Layout
- Appendix 11: Relay and Interface PCB Layout
- Appendix 12: Display PCB Layout
- Appendix 13: System Bias PCB Layout
- Appendix 14: Main Inverter Bottom PCB Layout
- Appendix 15: Main Inverter Top PCB Layout
- Appendix 16: Control and Fault PCB Layout
- Appendix 17: Cap Bias Bottom PCB Layout
- Appendix 18: Cap Bias Top PCB Layout
- Appendix 19: Suppressor PCB Layout
- Appendix 20: COOLING DIAGRAM
- APPENDIX 21: System Schematic 300A, 480V PG 1
- APPENDIX 22: System Schematic 300A, 480V PG 2
- Appendix 23: Advanced Troubleshooting
- APPENDIX 24: PUBLICATION HISTORY
- 0-5274-TOC.pdf
- SECTION 1:GENERAL INFORMATION
- 1.01 Notes, Cautions and Warnings
- 1.02 Important Safety Precautions
- 1.03 Publications
- 1.04 Note, Attention et Avertissement
- 1.05 Precautions De Securite Importantes
- 1.06 Documents De Reference
- 1.07 Declaration of Conformity
- 1.08 Statement of Warranty
- SECTION 2: SPECIFICATIONS
- 2.01 General Description Of The System
- 2.02 Plasma Power Supply
- 2.03 Remote Arc Starter
- 2.04 Gas Control Module
- 2.05 Precision Plasma Cutting Torch
- 2.06 Specifications & Electrical Requirements
- 2.07 Power Supply Dimensions
- 2.08 Power Supply Rear Panel Features
- 2.09 Gas Requirements
- 2.10 Gas Applications
- 2.11 XT Torch Specifications
- SECTION 3: INSTALLATION
- 3.01 Installation Requirements
- 3.02 System Layout
- 3.03 Recommended Gas Supply Hose
- 3.04 Leads and Cables All Amperage
- 3.05 Lift the Power Supply
- 3.06 Connect Input Power and Ground Cables
- 3.07 Connect Work Cable and Pilot and Negative Leads
- 3.08 Ground Connections
- 3.09 Connect Coolant Leads
- 3.10 Connect Cables for CNC, Remote Arc Starter, GCM and HE 400
- 3.11 Handling and Installation of Fiber Optics
- 3.12 Set Switches on the Command - Control Module
- 3.13 Height Control Connections
- 3.14 Gas Control Module Installation
- 3.15 Fiber Optic Cable Installation
- 3.16 Gas Control Module: Control, Input, and Output Connections
- 3.17 Optional HE400 COOLER
- 3.18 Install Remote Arc Starter
- 3.19 Torch Valve Installation
- 3.20 Connecting Torch
- 3.21 Install Consumable Torch Parts
- 3.22 Voltage Divider for iHC Torch Height Control
- 3.23 Complete the Installation
- SECTION 4: OPERATION
- 4.01 Power Supply Control Panel
- 4.02 System Operation
- 4.03 Gas Selection
- 4.04 GCM 2010 Gas Control Module Operation
- 4.05 GCM 2010 First Time Operation Matching Gas Control to Lead Length
- 4.06 GCM 2010 Sequence Of Operation
- 4.07 Power Supply Status Codes
- 4.08 Remote Arc Starter Trouble Shooting
- SECTION 5: MAINTENANCE
- 5.01 General Maintenance
- 5.02 External Coolant Filter Cleaning Procedure
- 5.03 Coolant Replacement Procedure
- SECTION 6: REPLACEMENT ASSEMBLIES & PARTS
- 6.01 Replacement Power Supply
- 6.02 System Layout
- 6.03 Recommended Gas Supply Hose
- 6.04 Leads And Cables All Amperages
- 6.05 Power Supply External Replacement Parts
- 6.06 Power Supply Replacement Parts - Upper Right Side
- 6.07 Power Supply Replacement Parts - Lower Right Side
- 6.08 Power Supply Replacement Parts - Rear Panel
- 6.09 Power Supply Replacement Parts - Left Side
- 6.10 Gas Control Module (GCM-2010) Replacement Parts
- 6.11 Gas Control Module (GCM-2010) Replacement Parts
- 6.12 Remote Arc Starter (RAS-1000 XT) Replacement Parts
- 6.13 HE 400 Heat Exchanger - Replacement Parts
- SECTION 7: TORCH MAINTENANCE
- 7.01 Consumable Removal
- 7.02 O-Ring Lubrication
- 7.03 Parts Wear
- 7.04 Torch Consumables Installation
- 7.05 Coolant Leak Trouble-Shooting
- APPENDIX 1: Remote Arc Starter Schematic
- APPENDIX 2: Gas Control and Torch Valve Schematic
- APPENDIX 3: Gas Control Module Plumbing Diagram
- APPENDIX 4: Gas Control Module PCB Layout
- APPENDIX 5: Gas Control Display Module PCB Layout
- APPENDIX 6: CNC - Control Module PCB Connections
- APPENDIX 7: CNC
- CNC functions
- CNC Input / Output Descriptions
- Simplified CNC Circuit
- CNC Connections
- Appendix 8: CCM CPU PCB Layout
- Appendix 9: CCM I/O PCB Layout
- Appendix 10: Pilot PCB Layout
- Appendix 11: Relay and Interface PCB Layout
- Appendix 12: Display PCB Layout
- Appendix 13: System Bias PCB Layout
- Appendix 14: Main Inverter Bottom PCB Layout
- Appendix 15: Main Inverter Top PCB Layout
- Appendix 16: Control and Fault PCB Layout
- Appendix 17: Cap Bias Bottom PCB Layout
- Appendix 18: Cap Bias Top PCB Layout
- Appendix 19: Suppressor PCB Layout
- Appendix 20: COOLING DIAGRAM
- APPENDIX 21: System Schematic 300A, 480V PG 1
- APPENDIX 22: System Schematic 300A, 480V PG 2
- Appendix 23: Advanced Troubleshooting
- APPENDIX 24: PUBLICATION HISTORY
- SECTION 1:GENERAL INFORMATION