beautypg.com

Operation cutmaster 42 – Tweco 42 CutMaster Service Manual User Manual

Page 29

background image

OPERATION CUTMASTER 42

Manual 0-5171

4-3 Operation

B. Torch Connection

Check that the torch is properly connected.

C. Check Primary Input Power Source

1. Check the power source for proper input voltage. Make sure the input power source meets the power require-

ments for the unit per Section 2, Specifications.

2. Connect the input power cable (or close the main disconnect switch) to supply power to the system.

D. Gas Selection

Ensure gas source meets requirements listed in section 2T. Check connections and turn gas supply on.

E. Connect Work Cable

Clamp the work cable to the workpiece or cutting table. The area must be free from oil, paint and rust. Connect

only to the main part of the workpiece; do not connect to the part to be cut off.

Art # A-03387

F. Power On

Place the power supply ON / OFF switch to the ON (I) position. Power indicator

turns on.

Art# A-09335

Air Inlet

On/Off

Switch

Power Cord

A

120V 15A

120V 20A

230V 20A

24

40

20

20

30

27

Art# A-09339_AD

Rear Panel with ON/OFF Switch Front Panel With Power ON/OFF Indicator