Figure 33, Install pump tubing connection without filter – Metrohm 850 Professional IC Anion MSM-HC - LP-Gradient User Manual
Page 68
3.19 Peristaltic pump
■■■■■■■■■■■■■■■■■■■■■■
58
■■■■■■■■
850 Professional IC Anion MSM-HC LP Gradient
1
2
3
Figure 33
Install pump tubing connection without filter
1
Union nut
2
Adapter
3
Tubing olive
■
Slide union nut (33-1) onto the pump tubing.
■
■
Place the tubing olive (33-3) onto the pump tubing.
■
Screw the union nut (33-1) onto the tubing olive (33-3).
4 Inserting the pump tubing
■
Press the contact pressure lever all the way down.
■
Place the pump tubing in the tubing cartridge. The stoppers
(31-3) must snap into the corresponding holders of the tubing
cartridge.
5 Inserting the tubing cartridge
■
Hang the tubing cartridge in the mounting pin and press in the
cartridge holder until the snap-action lever snaps in.
6 Connecting the capillaries
■
Screw the respective capillaries tightly to the two tubing olives
with PEEK pressure screws (31-1).
Table 2
Pump tubings and suitable adapters
Pump tubing
Adapter
6.1826.020 (blue/blue)
6.1826.310 (orange/green)
6.1826.320 (orange/yellow)
6.1826.330 (orange/white)