3 installation, 1 about this chapter, 2 initial installation – Metrohm 882 Compact IC plus – Anion User Manual
Page 20: About this chapter, Initial installation
3.1 About this chapter
■■■■■■■■■■■■■■■■■■■■■■
10
■■■■■■■■
882 Compact IC plus – Anion
3 Installation
3.1
About this chapter
The Installation chapter contains:
■
this overview.
■
a brief set of instructions for the initial installation of the 882 Compact
IC plus – Anion. At each step you will find cross-references to more
detailed installation instructions for individual components, should you
require such aids.
■
an installation diagram (see Figure 3, page 14), showing a com-
pletely installed 882 Compact IC plus – Anion.
■
several chapters (Chapter 3.4, page 15 and following) with detailed
installation instructions for all components, including those that are
already installed at the time the instrument is delivered.
3.2
Initial installation
Note
A number of the capillaries is already connected at the time the instru-
ment is delivered.
Installing 882 Compact IC plus – Anion
Install the instrument as follows:
1 Setting up the instrument
■
Place the instrument in a location of the laboratory which is suita-
ble for operation and free of vibrations.
The installation site must be protected against corrosive atmos-
phere and contamination by chemicals. If possible, avoid excessive
temperature fluctuations and direct sunlight.
2 Installations on the rear of the instrument
■
Place the detector in the instrument and connect it (see manual
of the detector).
■
Remove transport locking screws (see Chapter 3.6.1, page 19).