CommScope Trunk & Distribution Cable User Manual
Page 41
A minimum of 24 inches separation is required at each pole
passed. Measure from the clamp center bolt twelve inches
from each side.
Web Removal
The web must be removed on QR products leaving a
smooth round cable for splicing. Note: Do NOT use a
knife. Prior to removing any cable, remove the web. The
web on QR can be removed the length of the separation or
2 inches beyond the shrink tube length.
Cable Transition
Attach the device to the strand with main body of
connectors installed. Make the cable transition into the
device. A minimum of 6 inches of straight cable must
be maintained behind the connector to allow for
splicing and flexing.
Cable Transition
Ripley-Cablematic MWSS-xxx
Minimum Separation at
Pole Passing
Integrated Messenger Installation
4.12
Splicing
Note: Seperation
is required to
prevent cable
cracking
When hand forming the transition into the equipment, do not exceed minimum bend specification.
Note: Start on the span side.
Note: Web removed before splicing cable