Chapter 3 installation, Unpacking and inspection, Unit placement – Bird Technologies DA40 UHF Series-Manual User Manual

Page 21: Unpacking and inspection unit placement

background image

7

Chapter 3

Installation

This chapter provides information for on-site requirements, unpack-
ing, inspection, and preparing the Digital Air load for use.

Unpacking and Inspection

1. Carefully inspect the shipping container for signs of damage.

Note:

If damage is noticed, do not unpack the unit. Immedi-

ately notify the shipping carrier and Bird Technologies Group.

2. Unpack the unit.

Note:

Save the packing materials in case the unit should

need to be shipped again.

3. Inspect all of the components for visible signs of damage.

Note:

Immediately notify the shipping carrier and Bird

Technologies Groups.

Unit Placement

Refer to the guidelines in this section when placing the load. Handles
are provided for all models. Forklift openings are provided for larger
models (see Figure 1). Placement of these models without the use of a
forklift is not recommended.

z

Do not use in exposed outdoor locations or in areas of condens-
ing humidity.

z

Surrounding air must be free of contaminants or particles that
could be drawn into the air intakes.

z

Digital Air loads have no intermediate dielectric fluid or coolant.
No water hookups are required.

z

Digital Air loads are designed to be used upright.

Note:

Consult the factory for other intended orientations.

Make sure the following open air requirements are met: