Before you begin, Installing a kinetix 2000 shunt module – Rockwell Automation 2093-ASP06 Kinetix 2000 Shunt Module Installation Instructions User Manual
Page 5
Kinetix 2000 Shunt Module
5
Publication 2093-IN002A-
MU-P - December 2006
Before You Begin
Remove all packing material, wedges, and braces from within and around the components.
After unpacking, check the item name-plate catalog number against the purchase order.
Kinetix 2000
Drive Component Box Contents
Installing a Kinetix 2000 Shunt Module
These procedures assume you have mounted your power rail, integrated axis module (IAM),
and axis modules (AM). Power rails accommodate one IAM and up to seven AMs, in addition
to a shunt module. Install a slot filler in any slot not occupied by axis modules or a shunt
module.
For installation instructions regarding equipment and accessories not included here, refer to
the instructions that came with those products.
Drive Component
Ships With
Shunt module
• Wiring plug for an external shunt resistor (RC).
• Wiring plug for the thermal switch (TS).
• This manual, Installation Instructions, publication 2093-IN002.
WARNING
To avoid the hazard of electrical shock, perform all mounting and wiring of
modules (IAM, AM, shunt module, or slot filler) and the power rail before you
apply power. Once power is applied, connector terminals may have voltage
present even when not in use.
ATTENTION
Plan the installation of your system so that you can perform all cutting,
drilling, tapping, and welding with the system removed from the enclosure.
Because the system is of the open type construction, be careful to keep any
metal debris from falling into it. Metal debris or other foreign matter can
become lodged in the circuitry, which can result in damage to components.