6

F.

EP-CSD-1 Control System

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.
1. Install Gas Control Assembly on Manifold. See

Figure 17.

2. Install pilot burner piping and controls. See Figure

17.

3. Install Ignition Transformer.

a. Attach Ignition Transformer to Jacket Vestibule

Panel using four (4) #8 x ½” lg. sheet metal

screws.

b. Connect Ignition Lead from Pilot to Ignition

Transformer.

4. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box.
a. Canada only - loop 4” nylon cable tie between

junction box and transformer/control center.

b. Attach transformer/control center to junction

box.