beautypg.com

Burnham 8H User Manual

Page 15

background image

5

III. Gas Control System Assembly (Knockdown Boilers)

A.

24V Standing Pilot Control System

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.
1. Install Gas Control Assembly on Manifold. See

Figure 10. Use thread (joint) compound (pipe dope)

resistant to action of liquefied petroleum gas.

2. Install pilot burner piping and controls. See Figure

10.

3. Connect Thermocouple Lead to Gas Valve.
4. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box.
a. Canada only - loop 4” nylon cable tie between

junction box and transformer/control center.

b. Attach transformer/control center to junction

box.

B.

EI (Intermittent Ignition)

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.
1. Install Gas Control Assembly on Manifold. See

Figure 11. Use thread (joint) compound (pipe dope)

resistant to action of liquefied petroleum gas.

2. Install pilot burner piping and controls.

a. Honeywell EI

i. USA - See Figure 12.
ii. Canada - See Figure 13.

3. Install Ignition Module.

a. Attach Ignition Control Mounting Bracket to

Jacket Vestibule Panel using two (2) #8 x ½”

sheet metal screws.

b. Attach Honeywell Ignition Module to Mounting

Bracket using two (2) #8 x ½” sheet metal

screws.

c. Connect pilot ground wire and ignitor/sensor

lead(s) to ignition module. Refer to “Section VII:

Electrical” for connection details.

4. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box. See Figure 8.
a. Canada only - loop 4” nylon cable tie between

junction box and transformer/control center.

b. Attach transformer/control center to junction

box.

C.

OP Control System

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.

1. Install Gas Control Assembly on Manifold. See

Figure 14. Use thread (joint) compound (pipe dope)

resistant to action of liquefied petroleum gas.

2. Install pilot burner piping and controls. See Figure

14.

3. Connect Thermocouple Lead to Gas Valve.
4. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box.
a. Canada only - loop 4” nylon cable tie between

junction box and transformer/control center.

b. Attach transformer/control center to junction

box.

D.

OP-CSD-1 Control System

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.
1. Install Gas Control Assembly on Manifold. See

Figure 15. Use thread (joint) compound (pipe dope)

resistant to action of liquefied petroleum gas.

2. Mount pilot switch.
3. Install pilot burner piping and controls. See Figure

15.

4. Connect Thermocouple lead to pilot switch.
5. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box.

6. Attach transformer/control center to junction box.

E.

EP Control System

Install Gas Control System. All components are

located in Combination Boiler Parts and Control

Carton.
1. Install Gas Control Assembly on Manifold. See

Figure 16.

2. Install pilot burner piping and controls. See Figure

16.

3. Install Ignition Transformer.

a. Attach Ignition Transformer to Jacket Vestibule

Panel using four (4) #8 x ½” lg. sheet metal

screws.

b. Connect Ignition Lead from Pilot to Ignition

Transformer.

4. Mount Transformer (continuous circulation) or

Control Center (intermittent circulation) to Junction

Box.
a. Canada only - loop 4” nylon cable tie between

junction box and transformer/control center.

b. Attach transformer/control center to junction

box.