beautypg.com

MacDon FD70 for Combine Operators User Manual

Page 215

background image

SECTION 10. MAINTENANCE AND SERVICING

Form 169006

213

Revision D

10.14.14.4 Bushing Installation: 5-Bat Pick-Up

Reels

a. At center disc and left end disc, position bushing

halves (G) on tine tube so that lug in each
bushing half locates in hole in tine tube.

b. Slide tine tube inboard (towards cam end) to

locate bushing in reel arm.

c. At the cam end disc, position bushing halves (C)

on tine tube so that lug in each bushing half
locates in hole in tine tube.

d. Slide reel arm (B) onto bushing, and position

against disc at original location.

e. Install bolts (A) in original holes, and tighten.

f.

Re-install any fingers or tines that were removed.

g. Re-install bolt (D) at on cam linkage.

h. Install bushing clamps as previously described.

G

B

A

C

D

This manual is related to the following products: