MacDon 871 Combine Adapter User Manual
Page 36
36
Adapter Mounting Instructions
for John Deere Combines
PREPARING THE COMBINE
1. For 7720, 9500 and CTS combines, check with
Combine dealer to ensure combine is equipped
with tire size, rear ballast etc. to carry larger
headers.
2. IMPORTANT: To prevent damage to feeder
house and/or adapter feed auger, remove
feeder house dust shields (A).
NOTE: Contour master shields are not
removable. The adapter feed auger has been
moved forward to compensate for this.
3. Lock pin (B) both sides must be in retracted
position before attaching adapter.
4. If combine is equipped with variable speed
header drive, set header drive speed to 520
RPM.
5. Set feeder chain to high speed. Additional
chain links will be required. Refer to Combine
Operator’s Manual.
6. Move front drum back to the mid-position or
further to loosen feeder chain. After adapter is
attached to combine, tighten feeder chain. If
there is interference with the feed auger,
remove a link from the feeder chain. Recheck
clearance when the front drum of the feeder
house is floated fully up.
7. Level Land Prior to 50 Series Feeder House:
Attach spline shaft provided with adapter to
feeder house L/H output drive as follows:
7720, 9500, 9510 & CTS
a. Remove existing sprocket coupler.
b. Ensure that the three 3 inch long bolts (C) are
just tight enough to eliminate gaps between
parts, but no tighter.
c. Position spline shaft & clamp assembly onto
shaft and tighten the two 4-½ inch long bolts
(D) evenly to 80 ft.lbs. (110 N·m).
d. Tighten the three 3 inch long bolts (C) to 80
ft.lbs. (110 N·m).
8820, 9600 & 9610
a. Remove the three 3 inch long bolts connecting
spline shaft (F) to clamp halves.
b. Attach spline shaft (F) directly to sprocket with
three 1/2 x 1-1/4 bolts and flange nuts
provided.
LEVEL LAND PRIOR TO 50 SERIES:
7720, 9500, 9510 & CTS - ATTACH
SPLINE SHAFT & CLAMP
D
C
LEVEL LAND PRIOR TO 50 SERIES:
8820, 9600 & 9610
ATTACH SPLINE SHAFT
F
LOCK PINS RETRACTED
A
B
REMOVE