Stile, Installation of formed ridge – Metal Sales Stile Installation User Manual
Page 32
STILE
31
© Metal Sales Manufacturing Corporation/ Subject to change without notice
1. It will be necessary to field cut the ends of the three pieces of Formed Ridge where they intersect.
2. The Formed Ridge on the first hip should be cut at approximately a 45 degree angle at the corner
where it will intersect with the Formed Ridge of the second hip.
3. The Formed Ridge on the second hip will then need to be cut at an angle so that it neatly joins the
Formed Ridge on the first hip.
4. Place foam Universal Closure under the flanges of the Formed Ridge where they meet the Stile
panel.
5. Place Tube Sealant where the two pieces of Formed Ridge meet each other.
6. Fasten the Formed Ridge at the hip with a
1
/
8
" Pop Rivet to the top of each panel rib.
7. The Formed Ridge on the ridge of the roof should now be installed and trimmed so as to fit neatly
over the Formed Ridge on the hips.
8. Install Stile Closure under the flange on each side of the Formed Ridge.
9. Fasten Formed Ridge at the ridge with a
1
/
8
" Pop Rivet to the top of every other panel rib.
HIP CONDITION
INSTALLATION OF FORMED RIDGE
(CONT)
FORMED RIDGE (AT RIDGE)
FORMED RIDGE (AT HIP)
FIELD CUT TO FIT NEATLY OVER
FORMED RIDGE AT HIPS
STILE PANEL
POP RIVETS
TOP VIEW
FORMED RIDGE (AT HIP)
FORMED RIDGE (AT RIDGE)