beautypg.com

Stile, Installation of panel – Metal Sales Stile Installation User Manual

Page 26

background image

STILE

25

© Metal Sales Manufacturing Corporation/ Subject to change without notice

INSTALLATION OF PANEL

(CONT)

1. After placement of the first panel is established, a Stile Closure with Tube Sealant is placed at

the eave flush with the Stile panel.

2. Fastening of the panel can begin by placing a Woodscrew XL fastener in the first valley of the

Stile panel in the bottom leg just below the step. Place a second fastener in the first valley of

the Stile panel three steps up from where the first fastener was placed. Continue placing

fasteners up the length of the panel in the first valley of every third step. Do not place a fastener

in the last step of the panel if the run is longer than one panel and requires an endlap.

3. Place a fastener at every other valley and every third step over the remainder of the panel.

4. Complete the fastening of the panel to the roof deck by placing a fastener in every valley of the

Stile panel at the eave, ridge, or peak.

FASTENING OF PANEL

FASTEN EVERY VALLEY

AT RIDGE OR PEAK

FASTEN EVERY OTHER VALLEY

ON EVERY THIRD STEP

STEP

VALLEY

FASTEN EVERY

VALLEY AT EAVE

3 STEPS

3 STEPS

FASTEN AT INTERIOR OF PANEL

FASTEN AT EAVE, RIDGE AND PEAK

POP RIVET

STILE PANEL

WOODSCREW XL

STILE CLOSURE (

EAVE CONDITION SHOWN

)