Installation of the optional load/unload station – Leica Biosystems ST4040 User Manual
Page 23
23
Leica ST4040 – Linear Stainer
•
Place the optional load station on the left
side of the basic instrument.
•
Pull the conveyor frame of the optional load
station upwards using both your hands.
4.
Installation of the Optional Load/Unload Station
•
Move the optional load station right up to the
instrument, inserting the two pins, located
on the left and right at the bottom of the op-
tional load station, into the corresponding
openings in the basic instrument.
•
Tighten the screw on the left wall of the op-
tional load station ring wrench, size10).
•
Plate (1) which connects optional load station
and basic instument is fastened with two Al-
lan screws.
In order to establish safe protective
grounding, it is essential to fasten plate
(1) securely.
1
•
Open the Lid
See also other documents in the category Leica Biosystems Equipment:
- SM2010 R (46 pages)
- CM305 S (66 pages)
- CE Knife holder (14 pages)
- CM1950 (78 pages)
- VT1200/VT1200 S (62 pages)
- VT1000 S (42 pages)
- HI1220 (18 pages)
- HI1210 (18 pages)
- CM1850 UV (56 pages)
- CM1850 UV (54 pages)
- CM1510-S (56 pages)
- CM3600 XP (114 pages)
- CM1100 (36 pages)
- CM1860/CM1860 UV (98 pages)
- Premium blade holder (14 pages)
- CM1520 (92 pages)
- VT1000 A (49 pages)
- VT1000 P (48 pages)
- SP2600 (51 pages)
- SM2500 (76 pages)
- SM2400 (8 pages)
- SM2000R (22 pages)
- EG1160 (32 pages)
- EG1150 C (20 pages)
- EG1150 H (42 pages)
- EG1130 (2 pages)
- EG1120 (2 pages)
- EG F (18 pages)
- ASP300 (70 pages)
- PELORIS_PELORIS II (160 pages)
- TP1020 (102 pages)
- ASP200 S (88 pages)
- ASP300 S (88 pages)
- ASP6025 (178 pages)
- LN22 (44 pages)
- RM CoolClamp (20 pages)
- RM2265 (88 pages)
- RM2255 (82 pages)
- RM2245 (78 pages)
- RM2235 (78 pages)
- RM2125 RTS (60 pages)
- SP9000 (30 pages)
- SP1600 (10 pages)
- ST5020 (88 pages)