beautypg.com

4 placing the instrument in its permanent position, 5 connecting the inlet hose to the tap, 6 leveling the instrument – Leica Biosystems ST4040 User Manual

Page 18: Permanent position, Installation

background image

18

Instruction Manual V1.4 – 06/2009

3.6.6 Leveling the instrument

When installed in its final posi-tion on
the laboratory bench, the instrument
must be exactly level! (see also chap-
ter 3.1 ‘Site requirements’).

If necessary, the instrument can be slightly
readjusted via the adjustable instrument
feet.

For that purpose, screw the instrument feet
in or out, as needed, until the instrument is
positioned horizontally.

3.

Installation

3.6.5 Connecting the inlet hose to the tap

Connecting to 3/4“ water tap:
Connect the ball valve to the water tap and
attach the tap water inlet hose to the ball
valve.

Connecting to 1/2“ water tap:
Fit the adapter in between water tap and
ball valve.

When setting up the instrument, an ad-
justment of the tap water flow rate has
to be done. This adjustment cannot be
done until after the tap water stations
have been inserted. - For detailed in-
structions on the flow rate adjustment,
see Chapter 6.8.3!

3.6.4 Placing the instrument in its

permanent position

Place the instrument in its permanent posi-
tion on the laboratory bench.

Connect the exhaust air hose to the fume
hood, or lead outside.

Insert drain hose into drain.

For safety reasons, we recommend us-
ing a so-called ‘Aquastop’ device, as
commonly used with household appli-
ances.

Do not yet open neither water tap nor ball
valve (see above)!

Ball valve closed.