3 unpacking and installation, Unpacking and installation, Instrument setup – Leica Biosystems RM2245 User Manual
Page 18
16
Instructions for Use V 1.9 RevC - 06/2013
4. Instrument Setup
4.3 Unpacking and installation
Fig. 8
Fig. 9
1
2
3
4
4
4
4
5
• Loosen and unscrew the six upper
screws (2).
• Remove the cover (1).
• Take the accessory carton (optional
accessories) (3) and the cartons (4)
from the standard scope of delivery.
The transport crate and includ-
ed retaining elements should
be kept in case a return ship-
ment is necessary later.
When the instrument is delivered, check the tilt indicators on the
packaging.
If the arrowhead is blue, the shipment was transported laying
flat, was tilted at too great an angle or fell over during transport.
Note this on the shipping documents and check the shipment for
possible damage.
See also other documents in the category Leica Biosystems Equipment:
- SM2010 R (46 pages)
- CM305 S (66 pages)
- CE Knife holder (14 pages)
- CM1950 (78 pages)
- VT1200/VT1200 S (62 pages)
- VT1000 S (42 pages)
- HI1220 (18 pages)
- HI1210 (18 pages)
- CM1850 UV (56 pages)
- CM1850 UV (54 pages)
- CM1510-S (56 pages)
- CM3600 XP (114 pages)
- CM1100 (36 pages)
- CM1860/CM1860 UV (98 pages)
- Premium blade holder (14 pages)
- CM1520 (92 pages)
- VT1000 A (49 pages)
- VT1000 P (48 pages)
- SP2600 (51 pages)
- SM2500 (76 pages)
- SM2400 (8 pages)
- SM2000R (22 pages)
- EG1160 (32 pages)
- EG1150 C (20 pages)
- EG1150 H (42 pages)
- EG1130 (2 pages)
- EG1120 (2 pages)
- EG F (18 pages)
- ASP300 (70 pages)
- PELORIS_PELORIS II (160 pages)
- TP1020 (102 pages)
- ASP200 S (88 pages)
- ASP300 S (88 pages)
- ASP6025 (178 pages)
- LN22 (44 pages)
- RM CoolClamp (20 pages)
- RM2265 (88 pages)
- RM2255 (82 pages)
- RM2235 (78 pages)
- RM2125 RTS (60 pages)
- SP9000 (30 pages)
- SP1600 (10 pages)
- ST4040 (50 pages)
- ST5020 (88 pages)