beautypg.com

Led lamp and harness installation – Landoll WFPC22-36 Wing Float Pulverizer User Manual

Page 32

background image

2-18

F-701

ASSEMBLY

LED Lamp and Harness Installation

NOTE

See Figures 2-17 and 2-18 for part placement and
reference.

1.

Attach a Red LED to both Light Weldments located
under the rear frame tube, using 1/4-20 X 1-1/2
Screws and Locknuts. Ensure the lens faces
rearward.

2.

Install the Amber LED’s inside the Light Shields.
Ensure 2 prong cord sticks out the light shield slot
opening. Attach to the end of the front frame tube
using 1/4-20 X 1-1/2 Screws and Locknuts.

3.

Attach the Light Module under the Light Module
Weldment located on top of the front frame tube,
using 1/4-20 X 1-1/2 Screws and Locknuts.

4.

Route the flat end of the 7 pin harness inside and
through the right side of the Drawbar A-Frame.
Attach to the Light Module. Route the other end
along the drawbar with the hydraulic hoses up to the
hitch point.

IMPORTANT

Cords are marked Left (Yellow Tape) and Right
(Green Tape).

5.

Layout the LED Lamp Harness. Note that the cords
are marked left (Yellow Tape) and right (Green Tape).
Attach the harness to the Light Module.

6.

Route the 2 prong cords along the left and right top of
the front frame tube and attach to Amber LED’s.

7.

Route the 3 prong cords along the top of the right
side inner frame tube, then along the top of the rear
frame tube, attach to the Red LED’s.

8.

Secure both harnesses with tie straps, making sure
to leave enough slack, where the drawbar meets the
frame, to allow the machine raise and lower. Secure
LED lamp harness molded union to the top of the
inner frame tube using Tie Straps. Bundle and
secure any excess cord with tie straps.

9.

Raise, lower, fold and unfold machine to check for
proper clearance, adjust accordingly.

IMPORTANT

All cords must be firmly attached to the machine
frame members, or hydraulic lines, so they don’t sag
or become torn loose by field debris. Use the cable
and hoses ties provided.

10. Attach the SMV sign to the SMV Mount using two

5/16-18 X 1 Screws, Washers, and Locknuts.

This manual is related to the following products: