Chapter 4: installation, Site requirements, Unpacking the drive components – ElmoMC Gold Line Digital Servo Drives-Gold Drum HV User Manual
Page 24: Chapter 4, Installation
Gold Drum HV Installation Guide (EtherCAT and CAN)
MAN-G-DRUMHVIG-EC (Ver. 1.202)
24
Chapter 4:
Installation
The Gold Drum HV (High Voltage) must be installed in a suitable environment and properly
connected to its voltage supplies and the motor.
4.1. Site Requirements
You can guarantee the safe operation of the Gold Drum HV (High Voltage) by ensuring that it is
installed in an appropriate environment.
Feature
Value
Ambient operating temperature
0 °C to 40 °C (32 °F to 104 °F)
Maximum non-condensing humidity 90%
Maximum Altitude
2,000 m (6562 feet)
Operating area atmosphere
No flammable gases or vapors permitted in area
Models for extended environmental conditions are available.
Caution: The Gold Drum HV (High Voltage) dissipates its heat by convection. The
maximum ambient operating temperature of 40 °C (104 °F) must not be
exceeded.
4.2. Unpacking the Drive Components
Before you begin working with the Gold Drum HV (High Voltage), verify that you have all of its
components, as follows:
•
The Gold Drum HV (High Voltage) servo drive
•
The Elmo Application Studio (EAS) software and software manual
The Gold Drum HV (High Voltage) is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold Drum HV (High Voltage):
1.
Carefully remove the servo drive from the box and the Styrofoam.
2.
Check the drive to ensure that there is no visible damage to the instrument. If any damage
has occurred, report it immediately to the carrier that delivered your drive.