beautypg.com

Anchor EVENT SERIES - PROFILE SIZE: 20M - 220X100X4 - 3M UPRIGHTS User Manual

Page 45

background image

Spanning the world.

BT 2000 240/300 570/627

44

7 Service notes

7.1 Construction of the tent

7.1.1 The restretching of the wind bracings, treaded bolt connections and

roof racings is requisite:

- every 3 months (stand-by time)

-

after

hot

periods

- after a strong gale

7.1.2 Pay attention to the earth-anchors, that is deep seated in a solid

position.


7.1.3 Check for deformation or damage.

7.1.4 If there are any damaged parts, then change them immediately with

new original spare parts.


7.2 Bedding and transport

To avoid damage to the aluminium profile you have to bed and to transport
all the aluminium profiles on a smooth area (e.g. RÖDER transport units) and
you have to pay attention to the profile, that stand out on the smaller profile
side.

7.3 Routine visual inspection

Periodically carry out a visual inspection after every use (e.g. after every event
day):

The inter- and eave purlins have to be hung up according to the rules.

The bolt- and pin connections have to be inspected.

Dirty covers have to be cleaned (the washing can take place in our own
RÖDER laundry).